Automated Manufacturing I

MFET 243

Fall '07

Lab Assignments
 

Assignments:

bullet

Lab #1 - Working with Local I/O
 

bullet

Lab #2 - Working with universal remote I/O
 

bullet

Lab #3 - Using RSLogix5000
 

bullet

Lab #4 - Basic Instructions
 

bullet

Lab #5 - Introduction to DeviceNet
 

bullet

Lab #6 - Programming The CIMT Conveyor System, Part 1
 

bullet

Lab #7 - Programming The CIMT Conveyor System, Part 2 {Revised}
 

bullet

Lab #8 - Controlling a Pneumatic Robot with a PLC, Part 1
 

Lab related notes:
 
bullet

None at this time...

Due date for next lab assignment:

bullet

Lab #7 due date: End of lab period on Tuesday 11/13/07. 
 

Due date for next lab report:

bullet

A lab report will be required for lab #6. Reports are due in class on Wednesday 11/14/07.  Please submit one lab report per lab group.  Follow the format outlined in the lab syllabus. 

Reference materials:

bullet Introduction to the CIMT Conveyor System
 
bullet Working with Local I/O
 
bullet Working with Universal Remote I/O
 
bullet Logix5000 Controllers General Instructions [Allen-Bradley]
 
bullet Logix5000 Controllers Common Procedures [Allen-Bradley]
 
bullet ControlLogix Selection Guide [Allen-Bradley]
 
bullet ControlLogix Digital I/O Modules User Manual [Allen-Bradley]
 
bullet Sequencer template for lab #8

 

Miscellaneous:
 
bullet Laboratory Syllabus
 
bullet Lab Report Score Sheet
 
bullet Error Codes for Lab Reports